NEC4: Effective Preparation and Management of the Construction Programme, Paperback/Tim (Irwin Mitchell, UK) Willis
Preț mediu — acordă atenție
Prețul de azi este aproape de media ultimelor 30 de zile. Minim în ultimele 30 de zile: 396,99 lei.
Preț azi
396,99 lei
Medie 30 z.
396,99 lei
vs. medie
0.0%
Calculat din 29 zile de istoric înregistrat.
Istoric preț
Oferte disponibile — 1 magazin
| Magazin | Produs | Trend ? | Preț | |
|---|---|---|---|---|
|
NEC4: Effective Preparation and Management of the Construction Programme, Paperback/Tim (Irwin Mitchell, UK) Willis
În stoc
·
acum 5 ore
|
0% |
396,99 Lei
|
Vezi oferta |
Produse similare
NEC4: Practical Solutions. 2 ed, Paperback/***
Elefant
Practical Guide to the NEC4 Engineering and Construction Contract, Hardback/Michael Rowlinson
Elefant
Construction Management JumpStart. The Best First Step Toward a Career in Construction Management, 4 ed, Paperback/***
Elefant
Construction Machines For Kids: heavy construction vehicles, machinery on a construction site children's book, Paperback/Conrad K. Butler
Elefant
Construction Genius: Effective, Hands-On, Practical, Simple, No-BS Leadership, Strategy, Sales, and Marketing Advice for Construction Compa, Hardcover/Eric Anderton
Elefant
Managing health and safety in construction. Construction (Design and Management) Regulations 2015, guidance on regulations, Paperback/***
Elefant
NEC4: A User's Guide. 3 New edition, Paperback/Jon Broome
Elefant
NEC3 and NEC4 Compared, Paperback/Robert Alan Gerrard
Elefant
NEC4: Defined Cost and Compensation Events, Paperback/Patrick Waterhouse
Elefant
NEC4: 100 Questions and Answers, Paperback/Kelvin Hughes
Elefant